Resources

Technical knowledge for security decision-makers

Resources organised by decision stage — from early architecture questions through procurement, commissioning and lifecycle support.

Knowledge centre

Six resource families, organised by decision stage.

01

Solution guides

Architecture overviews and selection criteria for cyber defense, C-UAS, AI security and critical facilities.

  • Architecture
  • Selection
  • Planning
02

Engineering checklists

Practical preparation lists for site surveys, design reviews, commissioning and handover.

  • Survey
  • Design
  • Commissioning
03

Standards & compliance

Educational summaries of relevant international standards and program compliance considerations.

  • ISO/IEC
  • NIST
  • Regulatory
04

Technical tutorials

Step-by-step educational content for detection engineering, sensor fusion, cryptography and AI assurance.

  • Tutorials
  • Explainers
  • Operations
05

FAQs

Clear answers on turnkey delivery, integration, confidentiality, maintenance and support.

  • Delivery
  • Support
  • Lifecycle
06

Downloads

Capability statements, datasheets and specifications, released to qualified requesters.

  • Capability
  • Datasheets
  • Specifications

Technical guides, standards notes and procurement references are published as they are completed.

What buyers should evaluate before procurement

Six questions that separate a defensible security program from an expensive one.

  1. 01

    Is the requirement written before the product?

    A specification derived from one vendor's datasheet eliminates competition and locks in cost for a decade.

  2. 02

    Who acts on an alert, and under what authority?

    Detection without a named decision-maker and a reviewed mitigation envelope produces alarms, not protection.

  3. 03

    What does year three cost?

    Licences, spares, calibration, training and support usually exceed the capital cost. Price the lifecycle.

  4. 04

    Can the systems actually interoperate?

    Ask for the interface, the protocol and a tested reference — not a marketing claim of openness.

  5. 05

    Is the design justified by calculation?

    Coverage, capacity, power and thermal budgets should be demonstrable, not asserted.

  6. 06

    Who owns the documentation and the keys?

    Handover must include as-built documentation, credentials and the ability to change suppliers.

Engage

Need a specific technical guide?

Tell us the decision you are trying to make and we will send the relevant material — or write it.